Secured Trading Service

Insulating Boots Gloves Withstand Voltage and Current Leakage Test Equipment

Huazheng Electric Manufacturing (Baoding) Co., Ltd.
  • Audited Supplier
  • 12 yrs
Transactions: US$10,000+

Contact Supplier

Product Highlights

  • Multi-Channel Testing: Tests up to 8 pairs of gloves or boots simultaneously with separate leakage current monitoring.
  • High Voltage Safety: Patented infrared data communication ensures operator isolation from high voltage systems.
  • Automatic Control: Fully automatic testing with preset voltage, timing, and automatic data saving.
  • Data Management: Stores 60 groups of test data with real-time clock and on-site printing capability.
  • Intelligent Interruption: Automatic isolation of punctured units without stopping the test for remaining units.
  • Large Display: Large LCD screen displays 8 channels of parameters including voltage, current, and time.
  • Comprehensive Protection: Features over-voltage, over-current protection and high-voltage danger warning lamps.

Shipping

Shipping Cost:
Contact the supplier about freight and estimated delivery time.

Online Trading Protection

Payment Guarantee
T/T PayPal ApplePay GooglePay visa mastercard american express discover JCB diners club PIX SPEI OXXO PSE OZOW Platform-protected payments with refund support for eligible order issues.
Platform Logistics
Clearer shipment tracking with platform-supported logistics.
Inspection Service
Optional pre-shipment inspection for quality and quantity checks.
After-Sales & Dispute Handling
Platform-assisted dispute resolution, including refunds or returns when applicable.

Only orders placed and paid through Made-in-China.com Secured Trading are eligible for payment protection and the corresponding platform services.

Product Images of Insulating Boots Gloves Withstand Voltage and Current Leakage Test Equipment

Insulating Boots Gloves Withstand Voltage and Current Leakage Test Equipment
Insulating Boots Gloves Withstand Voltage and Current Leakage Test Equipment pictures & photos
Insulating Boots Gloves Withstand Voltage and Current Leakage Test Equipment
Insulating Boots Gloves Withstand Voltage and Current Leakage Test Equipment pictures & photos
Insulating Boots Gloves Withstand Voltage and Current Leakage Test Equipment
Insulating Boots Gloves Withstand Voltage and Current Leakage Test Equipment pictures & photos
Insulating Boots Gloves Withstand Voltage and Current Leakage Test Equipment
Insulating Boots Gloves Withstand Voltage and Current Leakage Test Equipment pictures & photos
Insulating Boots Gloves Withstand Voltage and Current Leakage Test Equipment
Insulating Boots Gloves Withstand Voltage and Current Leakage Test Equipment pictures & photos
Insulating Boots Gloves Withstand Voltage and Current Leakage Test Equipment
Insulating Boots Gloves Withstand Voltage and Current Leakage Test Equipment pictures & photos
Insulating Boots Gloves Withstand Voltage and Current Leakage Test Equipment
  • Insulating Boots Gloves Withstand Voltage and Current Leakage Test Equipment
  • Insulating Boots Gloves Withstand Voltage and Current Leakage Test Equipment
    Insulating Boots Gloves Withstand Voltage and Current Leakage Test Equipment
  • Insulating Boots Gloves Withstand Voltage and Current Leakage Test Equipment
    Insulating Boots Gloves Withstand Voltage and Current Leakage Test Equipment
  • Insulating Boots Gloves Withstand Voltage and Current Leakage Test Equipment
    Insulating Boots Gloves Withstand Voltage and Current Leakage Test Equipment
  • Insulating Boots Gloves Withstand Voltage and Current Leakage Test Equipment
    Insulating Boots Gloves Withstand Voltage and Current Leakage Test Equipment
  • Insulating Boots Gloves Withstand Voltage and Current Leakage Test Equipment
    Insulating Boots Gloves Withstand Voltage and Current Leakage Test Equipment
  • Insulating Boots Gloves Withstand Voltage and Current Leakage Test Equipment
    Insulating Boots Gloves Withstand Voltage and Current Leakage Test Equipment

Find Similar Products

Product Description

Insulating Boots Gloves Withstand Voltage And Current Leakage Test Equipment

General Introduction

The insulating boots and the insulating gloves are prerequisite appliances for operation and maintenance of the electric power system. The testing methods and cycles for safety appliances including the insulating boots and the insulating gloves is stipulated in the Safety Code of Electric Power Industry (DL408). For the dielectric voltage withstand test for the insulating boots and the insulating gloves, the testing cycle is half year, no puncture is allowed during the teat, and meanwhile the leakage current of the insulating boots shall not be over the limit value.
The patented technology for the multi-channel high voltage leakage test and the infrared data communication are adopted for the apparatus; hence the purpose of measuring the high voltage leakage current safely can be realized. Owing to the application of the technologies, the testing apparatus is wholly isolated from the high voltage system, so that not only the multi-channel high voltage leakage current can be measured precisely, but also the safety of the testing operators can be ensured.
Eight pieces of the appliances can be tested at the same time so as to improve the working efficiency. The patented high voltage interrupting technology is adopted for avoiding repetition of the tests. During the test, the punctured pieces can be separated from the high voltage system and the remaining pieces without puncture will be tested till finishing the test.Insulating Boots Gloves Withstand Voltage and Current Leakage Test Equipment

Main Functions and Technical Parameters

Main Functions
2.1.1 Eight pieces of the insulating boots or the insulating gloves ca be tested at the same time, while the leakage current can be tested separately.
2.1.2 Using the large LCD screen, more information can be displayed. Eight channels of parameters including high voltage leakage current, testing voltage, testing current, recorded time can be displayed on the screen at the same time.
2.1.3 The parameters such as the testing voltage and the primary current of the testing transformer can be measured.
2.1.4 Using the patented technology for the infrared data communication, the operating console is wholly isolated from the high voltage system, so that the safety of the operators is ensured.
2.1.5 The dielectric withstand voltage test is an automatic test. Once the test is started, the apparatus shall be switched on automatically, and then the voltage shall be raised to the preset voltage according to the speed required by the national standard. Once the preset voltage is reached, the apparatus shall start recording the time and the testing voltage shall be maintained. When the time is up, the voltage shall be decreased to zero and the power shall be switched off, in the meantime the leakage current of each tested piece shall be displayed and the testing result shall be saved automatically.
2.1.6 The special earthing vessels are available for easy operation.
2.1.7 There is high voltage interrupting control for each channel of the tested piece. Once there is puncture in one of the channel, the tested piece of the channel shall be isolated from the high voltage while the proceeding of the test shall not be influenced.
2.1.8 There is protective function for over voltage and over current.
2.1.9 There is warning lamp alarming for high voltage danger.
2.1.10 Sixty groups of testing data and result can be saved for referring at any time.
2.1.11 There is function of the real time calendar and clock.
2.1.12 The testing data can be printed on site. 

Technical Parameters 
Rated output voltage: 50 kV
Rated capacity: 5 kVA
Output voltage measuring range: 50.0 kV(250V)
Voltage measuring tolerance: <±(0.2%U+0.02%Umax), among which U is the displayed value and Umax is the upper limit value.
Input current measuring range: 25.0A
Current measuring tolerance: <±(0.2%I+0.02%Imax),among which I is the displayed value and Imax is the upper limit value.
Leakage current measuring range: 25.0mA
Leakage current measuring tolerance: ±(0.5%I+2 counts), among which I is displayed.
Leakage current resolution ratio: 0.1 mA
Time limit of digital display: 10~990 S

V.Company Information
HuaZheng Electric Manufacturing (Baoding) Co.,Ltd is the supplier of the State Grid in China.It means we are the supplier of the Chinese Government.And our products spread throughout the whole China.

What's more, our customers come from different countries like America, England, Bulgaria, Brazil, Chile, Malysia, Vietnam and so on.


Our main products are Insulation Oil Tester, Cable Fault Locator, Power Quality Analyzer, High Voltage Generator, High Voltage Capacitor, Testing Transformer and so on.
Insulating Boots Gloves Withstand Voltage and Current Leakage Test Equipment


VI.Customer Visit
Insulating Boots Gloves Withstand Voltage and Current Leakage Test Equipment


VII.Exhibition
Insulating Boots Gloves Withstand Voltage and Current Leakage Test Equipment


VIII.Similar Recommendation

Insulating Boots Gloves Withstand Voltage and Current Leakage Test Equipment
 

About the Supplier

This supplier has been audited by SGS. Verify the report on the official SGS website with ID "QIP-ASR246684". Items marked "verified" are certified.

Watch Video
Watch Video
Huazheng Electric Manufacturing (Baoding) Co., Ltd.
Huazheng Electric Manufacturing (Baoding) Co., Ltd.
Huazheng Electric Manufacturing (Baoding) Co., Ltd.
Huazheng Electric Manufacturing (Baoding) Co., Ltd.
Huazheng Electric Manufacturing (Baoding) Co., Ltd.
Huazheng Electric Manufacturing (Baoding) Co., Ltd.
Huazheng Electric Manufacturing (Baoding) Co., Ltd.
Huazheng Electric Manufacturing (Baoding) Co., Ltd.

About Our Factory & Business Background

verified Business Type
Manufacturer/Factory
Address
No. 3, Building 9, High-Tech Digital Valley, No. 3099, Xiangyang North Street, Baoding, Hebei, China
verified Plant Area
700 square meters
verified Number of Employees
24
verified Registered Capital
10,000,000 RMB
verified Terms of Payment
LC, T/T, D/P, PayPal, Western Union, Small-amount payment
verified International Commercial Terms(Incoterms)
FOB, CIF, CFR, EXW
verified Average Lead Time
Peak Season Lead Time: within 15 workdays
Off Season Lead Time: within 15 workdays
verified Nearest Port
Tianjin Port
verified Minimum Order Quantity
1 Set
verified Supply Chain Partners
15

Our Production Capability & Technical Expertise

verified Main Products
Transformer Tester, Transformer Oil Tester, Relay Tester, High Voltage Tester, Circuit Breaker Tester
verified Production Lines
10
verified Production Machines
Lathe, Bench Drilling Machine, Electric Tool, Electric Soldering Iron, Winder, Super Mute Terminal Machine
verified QA/QC inspectors
3 people
verified Inspection Type for Finished Products
100% inspection(Visual inspection & Function inspection)
verified Inspection Method for Finished Products
Have instructions and uniformly followed
verified Customization Options
Customization from Samples, Customization from Designs, Full Customization, Minor Customization, Flexible customization
verified ODM Service Available
Yes
verified OEM Service Available
Yes
verified R&D Engineers
1 people
verified Traceability of Raw Materials
Yes
verified Own Brand
Yes

Our Industry Experience & Global Business Record

verified Year of Establishment
2008-03-13
verified Export Year
16 years
verified Main Markets
South America
verified Repeat Buyers Choice
80%~100%
verified Number of Foreign Trading Staff
13
verified Overseas Agent/Branch
No
verified New Products Launched in Last year
No

Our Certifications, Standards & Industry Recognition

verified Management System Certification
ISO9001:2015
verified Product Certification
CE
verified Cooperated with Fortune 500
No

FAQ

How many pairs of gloves or boots can be tested simultaneously?
The equipment can test up to 8 pairs of insulating gloves or boots at the same time.
What is the maximum output voltage?
The rated output voltage is 50 kV.
Is the testing process automatic?
Yes, the dielectric withstand voltage test is fully automatic, including voltage ramping, timing, and result saving.
How does the machine handle a punctured unit during testing?
It uses patented high voltage interrupting technology to isolate the punctured unit immediately while continuing the test on others.
What safety features are included?
It includes over-voltage and over-current protection, warning lamps for high voltage danger, and infrared isolation for operator safety.
Can the test results be saved and printed?
Yes, it can store 60 groups of data and print testing results on-site.
What is the warranty period?
The product comes with a 1-year warranty.
What is the minimum order quantity?
The minimum order quantity is 1 set.

Send your message to this supplier

Contact Information
Recipient
Message

Enter between 20 to 4,000 characters.

This is not what you are looking for? Post a Sourcing Request Now

Product Groups

Product Catalogs